


June 1-10 Tuition: $2,200.00 Apply with API for exam by Apr 9.API Exam Window opens June11-25 Register for 2021 June API 570 Exam Prep Course. 2021 June API 570 Exam Prep Course 10 Day Course: 8 a.m.
#Api 570 course material free download verification
#Api 570 course material free download code
It is also the intent of this Code that owner/users shall respond to any inspection results that require corrective actions to assure the continued integrity of piping consistent with appropriate risk analysis. That program should provide reasonably accurate and timely assessments to determine if any changes in the condition of piping could possibly compromise continued safe operation. The intent of this Code is to specify the in-service inspection and condition-monitoring program as well as repair guidance that is needed to determine and maintain the on-going integrity of piping systems.

Process piping systems that are temporarily out of service but have been mothballed (preserved for potential future use) are still covered by this Code.

However abandoned in place piping may still need some amount of inspection and/or risk mitigation to assure that it does not become a process safety hazard because of continuing deterioration. Process piping systems that have been retired from service and abandoned in place are no longer covered by this ?in service inspection? Code. However, this piping Code could be used by owner/users in other industries and other services at their discretion. This publication does not cover inspection of specialty equipment including instrumentation, exchanger tubes and control valves. This inspection Code applies to all hydrocarbon and chemical process piping covered in 1.2.1 that have been placed in service unless specifically designated as optional per 1.2.2. API 570 covers inspection, rating, repair, and alteration procedures for metallic and fiberglass-reinforced plastic (FRP) piping systems and their associated pressure relieving devices that have been placed in service.
